快播如何看黄|国产激情视频|人成在久久综合网站|日本水蜜桃身体乳图片大全|特污兔午夜影视院|斗罗大陆女生去掉所有服装网站|爱与欲望的螺旋

中文
Projects
Testing Project of the East-West Expressway in Algeria

The East-West Expressway in Algeria is 1216 kilometers long with six lanes in both directions and is the main traffic artery running through the east-west direction of Algeria. 


Back

Main work undertaken

JSTI conducted testing technical consulting, data control, and inspection and measurement for the entire engineering project by establishing and operating the central laboratory of the general contractor, improving the overall quality control level.


Achievements

Won the 15th China Civil Engineering Zhan Tianyou Award.